Another set of works successfully delivered by the Jakebe Construction team.
Completed works include:
· Setting out for an 800 x 800mm base and associated trench on Platform
· CAT scan undertaken and tarmac disc cut
· Tarmac broken out and excavation completed to form a 450mm trench and base
· 67mm core hole drilled through existing wall
· Installation of 64mm duct from base through wall
· Trench reinstated with pea gravel, warning tape, and backfilled in compacted layers
· Cold-lay tarmac installed and compacted to finished level
· Spoil removed, site fully tidied, and barriers reinstated and cable-tied around base, left ready for concrete works
Works completed safely, efficiently, and to a high standard, maintaining a clean and controlled working environment throughout.