Droitwich- Bollard replacement completed 

Another successful delivery by the Jakebe Construction team at Droitwich 

Work Completed: 

  • Broke out and removed old concrete bollard 
  • Excavated and prepared the area 
  • Installed new bollard with fresh concrete 
  • Laid cold-lay tarmac and compacted to ground level 
  • Applied overband to seal the tarmac joint 
  • Painted bollard top yellow to match existing site features 
  • Left the site clean and tidy 

Dave delivers safe, durable solutions with attention to detail every step of the way. 

Great work today!! 

Leave a Reply

Your email address will not be published. Required fields are marked *