Another successful delivery by the Jakebe Construction team at Droitwich
Work Completed:
- Broke out and removed old concrete bollard
- Excavated and prepared the area
- Installed new bollard with fresh concrete
- Laid cold-lay tarmac and compacted to ground level
- Applied overband to seal the tarmac joint
- Painted bollard top yellow to match existing site features
- Left the site clean and tidy
Dave delivers safe, durable solutions with attention to detail every step of the way.
Great work today!!



