Great work by Dave carrying out duct installation in Hartford.
Completed Works:
• Marked out tarmac and carried out a CAT scan
• Disc cut, broke out and excavated to the required depth between the existing chamber and the CCTV pole
• Installed ducting between both points
• Laid pea gravel and warning tape
• Backfilled and compacted in layers
• Laid cold lay tarmac and overbranded joints
• Broke through the brick wall to run ducting to trunking on the opposite side of the roadway
• Final tidy-up of the work area
Another job was completed efficiently, ensuring a safe, durable installation to a high standard.